Kensington Leisure Centre

Demolition of existing complex, for the construction of three pools, basement courts and RC frames

Asbestos removal, Soft Strip, Structural Demolition of existing leisure complex, Service Diversion, Piling Mat and Piling, Recycled exterior materials, Temporary works, Bulk dig, construction of 3 pools, basem

Maroush Factory

Demolition of an existing ambulance station for the construction of Maroush food factory

Demolition

Elmbridge Leisure Centre

Construction of a 25m swimming pool to tolerances of -0/+10 mm

Demolition, Groundworks, Ground Stabilisation, Swimming Pool Excavation, Piling, Drainage, External Works & Landscaping.

Merevale Biogen

Appointed as principal contractor to carry out the construction of a new anaerobic digestion plant

lved the installation of 9000 metres of steel tube piling for foundations and reinforced concrete foundations, bases for the steel tanks and to create a fully bunded are with RC walls and slabs.