Client
Willmott Dixon
Date of completion
September 2006
Value
£1.4m
Scope of works
-
Demolition
-
Groundworks
-
Ground stabilisation
-
Swimming pool excavation
-
Piling
-
Drainage
-
External works and landscaping.
Project key points
-
An eight lane, 25m swimming pool to tolerances of -0/+10mm
-
Dynamic compaction used to induce settlement across the site
-
Pre-cast concrete bearing piles
-
Pile caps, a ground bearing slab and single-storey basement
-
Close proximity to high pressure Kerosene pipelines feeding Heathrow Airport
-
Demolition arisings were crushed on site and used for the piling mat as backfill
-
Hard landscaping, external works and topsoil placing