Herbarium Building, Kew Gardens
Temporary works, basement, groundworks and RC frame on site 20 metres from the River Thames
Cambridge MSM
The construction of two raft slabs: 2,700m² at 1m deep and 680m² at 2m deep, and 2 RC frames for Cambridge University.