Client
Walter Lilly
Date of completion
October 2008
Value
£3m
Scope of works
-
Temporary works
-
Basement construction
-
Groundworks
-
Four-storey RC frame
-
Waterproofing and drainage
Project key points
-
Temporary retaining works for basement excavation, including king post walls, sheet piling, underpinning, steel wallings with raker support
-
Excavation of 4000m³ of soil
-
Construction of pile caps and ground beams
-
Installation of below ground drainage including a cavity drainage system
-
Construction of reinforced concrete basement slab, retaining walls (both in waterproof concrete) and ground floor slab
-
Construction of walls, columns and slabs for four-storey superstructure including in-situ stairs