Client
Wates
Date of completion
May 2013
Value
£11m
Full Case Study Download
Scope of works
-
Enabling works.
-
Piling
-
Groundworks including basement works and superstructure
-
External works
-
Demolition of existing buildings and hard landscaping
Project key points
-
Five linked structures (six-storeys) built into slope
-
Bulk excavation of 10,000m³
-
Large reinforced concrete basement using both sheet piling and contiguous piling
-
8,000m² of reinforced concrete decking
-
4,500m² of reinforced concrete walls
-
2,500m² of reinforced concrete columns
-
7,000m² of post tensioned slabs
-
Type B finishes