Scope of works

 

  • Appointed directly by the client, Toureen performed the role of main contractor and oversaw the site being developed from a 9 acre (37,000) parcel of green field land to a fully functioning anaerobic digestion facility

  • Groundworks

  • Cut and fill

  • Substructure foundation works 

Biogen Plant Image 2

Project key points

 

  • Substructure foundation works including circular reinforced concrete bases up to 40m² dig, reinforced concrete walls to bunded storage area, flood defence

  • Flood gates, steel frame building including pre-cast, reinforced concrete and brick work superstructure, all electrical and mechanical services

  • Extensive landscaping, drainage and services works, extensive section 278 works on adjacent dual carriageway creating suitable site access