Client
BAM Construction
Date of completion
September 2012
Value
£7.8m
Scope of works
-
Asbestos removal
-
Demolition
-
Groundworks
-
The frames for both the UCL Academy and SCSSS combined in-situ rc frames with structural steelwork, pre-cast slabs, pre-cast balconies and pre-cast cladding.
Project key points
-
Demolition of three separate school buildings with the existing hydrotherapy swimming pool remaining live for the duration of the project
-
Groundworks including the installation of 2000m of 1.2m diameter stormwater attenuation pipes, four attenuation tanks, two rainwater harvesting tanks and a petrol interceptor
-
Fast track rc frame programme with the frame on the UCL building reaching six stories in just four months
-
The frames for both UCL Academy and SCSSS combined in-situ rc frames with structural steelwork, pre-cast slabs, pre-cast balconies and pre-cast cladding.
-
Installation of precast stairs, omnicore planks and hollowcore planks
-
Toureen was faced with a highly demanding programme when constructing the two schools in North London with a logistically challenging site surrounded by busy roads
-
Along with the interfaces between the various construction methods and materials, Toureen had various interfaces between other contractors to ensure the programme ran smoothly without delay